STEP & DESCRIPTION |
Builder |
||||||||||||
Check base casting build. |
|
||||||||||||
Thompson shaft oriented torqued and lubed with 10w oil. |
|
||||||||||||
Leveling pads mounted but not tightened. |
|
||||||||||||
Foam insulation in place. |
|
||||||||||||
Check y & x frame build. |
|
||||||||||||
Bearings & retainers mounted |
|
||||||||||||
Verify the x & y bearing preloads are set. |
|
||||||||||||
Limit rails and limit blocks mounted and activate limit switches. |
|
||||||||||||
Tie clamps mounted. |
|
||||||||||||
All brass pneumatics fittings installed. |
|
||||||||||||
Insure base, y frame, and x frame are mated together. |
|
||||||||||||
Check build & installation of x & y paddles. |
|
||||||||||||
Hardware tight dowels in place. |
|
||||||||||||
Bearings installed. |
|
||||||||||||
Check x & y table movement. |
|
||||||||||||
Ball screw units installed and lubed. |
|
||||||||||||
Motor, drive belt installed with proper belt tension adjusted. |
|
||||||||||||
Rotary disc installed. |
|
||||||||||||
Wheels mounted with proper hardware and internal tooth CSK. |
|
||||||||||||
Lock assy & drive motor installed & adjusted. |
|
||||||||||||
Wheel cams adjusted so dowel pins fit through disc bushings into the x-frame bushings. |
|
||||||||||||
|
|