Quality System Assessment Summary Report
Supplier: |
Commodity Team: |
Primary Audit Contact: |
Address: |
|
|
|
Supplier Commodity/Product Specialty: |
Audit Team: |
Phone: |
||
Fax: |
Elements |
Max. |
Audit Date:
|
Re-audit Date: / / |
% Improvement |
Physical/ Logistical Capabilities (for information only) |
Score (0-3) |
|
Score |
Score |
Score |
A. Geographic location |
3 |
1 Management Responsibility |
|
|
B. Plant condition / size |
3 |
|||
2 Quality System |
|
|
C. Employment / labor recruiting |
2 |
|||
3 Contract Review |
|
|
D. Finance resources |
3 |
|||
4 Design Control |
|
|
E. Pricing history |
2 |
|||
5 Document and Data Control |
|
|
F. Equip. Condition /age / application
|
2 |
|||
6 Purchasing and verification
|
|
|
G. Backlog / capacity status |
2 |
7 Customer Supplied Products |
|
|
Yes/ No for following |
8 Product Identification and Traceability |
4 |
|
H. ISO / QS 9000 certified |
Yes |
|||
9 Process Control |
|
|
I. Design Capability |
Yes |
|||
10 Inspection and Testing |
|
|
J. Quick turn/prototype capability |
Yes |
|||
11 Control of Inspection and Test Equip.
|
12 |
|
K. JIT capability / Kanban |
Yes |
12 Inspection and Test Status |
2 |
|
||||
13 Control of Nonconforming Product |
|
|
||||
14 Corrective and Preventive Action |
6 |
|
Calculations: |
|||
15 Handling, Storage, Pack. and Delivery |
9 |
|
1. Quality System Score (%): |
|||
16 Control of Quality Records |
5 |
|
Total Audit Score x 100 |
|||
17 Internal Auditing |
10 |
|
(Total Max. Score – N/A Score) |
|||
18 Training |
6 |
|
2. % Improvement: |
|||
19 Servicing |
4 |
|
(New Score – Previous Score) x 100 |
|||
20 Statistical Techniques |
30 |
|
Previous Score |
|||
21 Continuous Improvements |
|
|
Total Score |
|
|
Auditor’s Signature:
|
|||
% Score |
|
Date: |