Bulk material handle method and process on SMT production line

SMT patch bulk material problems have plagued many SMT people, as we all know, once the placement machine starts, there will definitely be a problem in the SMT production line. For a variety of reasons, many bulk materials are produced, thrown, or are originally bulk materials, or other reasons. Some bulk materials, such as resistors, capacitors, inductors, etc., are not easily distinguishable and have little value in themselves, and there is no value for reuse. However, for large devices, especially some imported chip components, they are of high value and can be distinguished and distinguished, so they are generally reused. However, for scattered components, if the original package is a tray or a suitable tray, the problem may be solved better. Otherwise, it may be more difficult to handle. Southern Machinery today will talk about the handling of bulk material in the SMT production line. Method and process.
First, the bulk material handle process

Collecting materials – material personnel sorting materials – using electrostatic bags to pack – paste material specifications – technicians based on bulk material springboard – hand paste bulk material – QC confirmation

Second, the definition

Bulk material: refers to the components that are separated from the original packaging during the production process due to machine throwing, or loading and unloading materials.

Third, job responsibilities

Material staff: responsible for the collection, classification, identification, storage, placement, and placement information of bulk materials, and the material loss rate is calculated according to the order.

QC in front of the furnace: responsible for the manual placement of bulk materials, the front back grain and material code confirmation, PCBA mark, and the classification of bulk materials.

Technician: Responsible for programming, patch production, monitoring patch quality distribution and timely improvement.

QC after the furnace: It is responsible for checking and checking the first piece of all the machines, and the quality is abnormal. Immediate feedback is provided to the front station to improve and track.

Fourth, the work content

  1. In the production process, the material may be thrown due to equipment and other factors, so the operator should check the material step before the patch and after the shift, and check the throwing box and the trash can each time the garbage is dumped. Collect the bulk material and report to the supervisor about excessive bulk material anomalies.
  2. According to the shape of the components, the bulk material is classified according to the shape of the components, and the back code of the components is checked to determine the material code. Then, the checked bulk materials are packed in anti-static bulk box or bulk bag, and the material code identification is performed to confirm the signature of the person. .
  3. When using machine mounting, the operator should first check whether the components are consistent with the normal materials, confirm the material number, and then load the FEEDER tape.
  4. The first piece of material feeding / mid-way refueling, the technician firstly inspects the materials that will be short of materials in the machine half-hour in advance, and collects the materials of the same item number in the component preparation area, and check them correctly, and submit them to the quality department QC/materials. The staff will check again and confirm the total signature of the refueling sheet.
  5.  